loading

Jinzong Machinery | Cosmetic Machinery & Chemical Machinery Manufacturers

English
Resin plant and turnkey project

Filling and sealing machine operation process

by:Jinzong Machinery     2021-04-04
Filling and sealing machine operation process: 1. Check that all components are in good condition, and firm, supply voltage is normal and air circuit is normal. 2. Check the sleeve chain, cup holder, CAM, switch and color code sensor are in good condition and reliable. 3. Check all the mechanical parts are connected correctly and has lubricating. 4. Check on the tube station, station pressure pipe, dimming, filling station and sealing station coordination. 5. The tools and other objects around cleaning equipment. 6. Check into all parts of the paper group are in good condition and firm. 7. Check whether the control switch is in the original position, and then use the manual roulette machine to determine whether there is a problem. 8. Before a process is normal, after open the power supply and air valve, gently push the machine commissioning, at a lower speed first, then gradually increase to normal after the normal speed. 9. On tube station tube motor speed adjustment, in order to make the speed of the electric rod match the speed of the machine, and maintain the operation of automatic drop tube. 1. Pressure tube station through the up and down reciprocating motion of connecting rod mechanism driving pressure head running at the same time, to attach a hose to the right place. 11. Arrived at lighting location, please use the car reached the lighting on the stand, rotate the lighting on the CAM to CAM proximity switch work towards lighting, and photoelectric switch beam light color code center. A distance of 5 - 1 mm. 12. Gas station is in the lighting stand up the hose, pipe jacking cone at the top of the tube close to the switch will be opened by PLC signal, and then through the electromagnetic valve. When the hose end distance is 2 mm, paste will finish filling and discharge. 13. Loosen the nut to adjust the filling quantity first, and then tighten in the corresponding screw, move the slider stroke arm to increase. Otherwise, adjust and lock nut finally. 14. Tail seal location can be adjusted according to the requirement of pipe end seal fluctuation position of jig, the tail sealing gaps between tooling is about. 2mm。 15. Open the power supply and air supply, start the automatic operation system, then enter full automatic filling and sealing machine automatic operation. 16. It is forbidden to the maintenance personnel adjust various setting parameters. If the setting is not correct, the device might not work properly, in serious cases it might damage the equipment, if need to adjust in the process of application, it must be adjusted when equipment to stop running. 17. Adjust the equipment during operation shall be strictly prohibited. 18. Stop by & other; Stop & throughout; Button, and then close the power switch and gas switch. 19. Thoroughly clean feed device and filling and sealing machine device. 2. Recording equipment running status and daily maintenance.
chemical reactor has become a standardized way of dealing with cosmetic machinery manufacturers.
Guangdong Jinzong Machinery Co., Ltd. are dedicated to providing excellent underwriting and loss control advice up front, and to ensuring superior customer service through the life of the policy.
To find a qualified at reasonable price, contact Guangdong Jinzong Machinery Co., Ltd. at Jinzong Machinery, a professional provider and tell them what you envision for your chemical reactor.
Guangdong Jinzong Machinery Co., Ltd. sells cosmetic machinery manufacturers and yet their focus on operational excellence and mastery of distributed manufacturing facilities cosmetic machinery manufacturers has made them the dominant player in the space.
Custom message
Chat Online 编辑模式下无法使用
Leave Your Message inputting...
Thank you for your enquiry. We will get back to you ASAP