Analysis of the filling machine breakdown

( 1) Compressed air hedge transformer jams or improper installation position during normal filling, compressed air through the two 1 mm holes formed gas pathway. When to set the weight measuring lever up, the connecting rod file * * transformer center blocking gas path, stop filling. If completely removing impurities transformer of compressed air. Cannot form the air channel, LPG filling. Transformer blocked but closed, at the end of the gas flux decreases, make the following pressure valve can not meet work pressure, slow, stop filling is not instant, cause overweight. Transformer is installed on the high side, make measuring high lever up and, more than the balance scale to make its block slice gas way, scale of the response lag, filling are overweight. Transformer is installed on the low side, make a lower measuring lever up and achieve balance balance at the end of the block has been blocking gas path, cause the scale of the response in advance, insufficient filling. Transformer installation is not straight, make measuring lever up, friction between the block slice and transformer, cause lever up slowly, filling caused by overweight. The solution is to remove transformer internal material and installed correctly. ( 2) Pressure valve is too dirty or the gas flux improper conditioning section due to the impurities into the compressed air pressure valve and accumulated to a certain extent, blocking its internal gas path, flux gets smaller, pressure valve can not meet work pressure, slow, stop filling is not instant, cause overweight. When the pressure valve of the gas flux adjustment is too large or too hours, can cause a spirit or slow pressure valve, causing insufficient filling or overweight. The solution is to remove pressure valve internal material and the size of the right to adjust the gas flux. ( 3) Pressure valve leakage. Internal pressure valve rubber diaphragm aged lose elasticity, membrane perforation, diaphragm installation errors, etc. , all can cause air inside the pressure valve leakage. Serious when all the compressed air from the stop button by light-leaking, then press the start button and filling pressure gauge to display & other; Filling and gas & throughout; , open the compressed air diaphragm valve, started to fill gas. But after loosening finger force pressure valve controlled air source, and a large amount of air leakage, internal pressure drops to zero. The diaphragm valve closed, stop filling and gas. Make the filling. Air leakage is not too serious, press the start button can fill gas. Slow release but, after refers to the pressure inside the valve leakage, filling according to pressure gauge pressure slowly drop to zero. The diaphragm valve closed, stop filling and gas. If the leak is small, the cylinder can be poured out in front of the air light-leaking. Little effect on the accuracy of the filling. If air leakage is larger, the cylinder still haven't finished filling and filling was stopped, caused by insufficient filling. Pressure valve diaphragm installation is very tight, not easy to remove. Such as forcibly removed, most will be destroyed, so the fault only replace the pressure valve can be completely solve. ( 4) Start or stop the damage to the two switch damage, respectively, will cause the cylinder or not filling can't stop. That cause insufficient filling or overweight. Change can solve the problem. In order to reduce the effects of the above four issues, and need in a timely manner to the compressed air dehydration, oil removal and remove impurities: at least once a day within the scale on sewage water separator; At least once a month removed all pneumatic components, incomplete decomposition, check its internal conditions, clean up the impurity, and ensure the correct installation.

GET IN TOUCH WITH Us
recommended articles
Projects News Blog
Choosing the Right Acrylic Resin Reactor for Your Production Needs

Acrylic resin reactors are an essential component of many production processes, used in a wide range of industries including pharmaceuticals, chemicals, polymers, and more.
Acrylic resin reactors play a crucial role in the production of various acrylic-based products, ranging from paints and adhesives to textile fibers and plastics.
Acrylic Emulsion Reactors in Coating Formulations

Acrylic emulsion reactors are widely utilized in the manufacturing of various coating formulations due to their numerous benefits.
Manufacturing acrylic emulsions can be a complex and challenging process.
Emulsion Polymerization Reactors: Principles and Practices

Are you interested in learning about the principles and practices of emulsion polymerization reactors? Emulsion polymerization is a widely used industrial process for producing polymers in the form of latex.
Emulsion Polymerization Reactor Configurations

Emulsion polymerization is an essential process in the production of a wide range of polymeric materials, including latex paints, adhesives, and synthetic rubbers.
Polyvinyl Alcohol (PVA) Reactors: Process Optimization Strategies

Polyvinyl alcohol (PVA) reactors play a crucial role in the production of various industrial products such as adhesives, textiles, and films.
Chemical reactors are essential devices used in various chemical processes in industries such as petroleum refining, petrochemicals, pharmaceuticals, and environmental engineering.
Introduction:

In the age of environmental awareness, the demand for biodegradable products is steadily increasing.
Epoxy Resin Reactors: Understanding Their Role in High-Performance Materials

Epoxy Resin Reactors: A Comprehensive Overview

Epoxy resin reactors play a crucial role in the production of high-performance materials.
no data

Tel: +86-758-3623881

E-mail: sales@jinzong.com.cn

Fax: +86-758-3623880

Address: NO.3 Kangtai St., Hi-tech Dist., Zhaoqing City, Guangdong Province, China(526238)

Copyright © 2025 Guangdong Jinzong Machinery Co., Ltd. www.jinzongmachinery.com| Sitemap  Privacy Policy
Customer service
detect