If open the delay, you may need to adjust the throttle of thin cylinder, fast to install and tighten the screw of the 3-way valve spring spring force, if the spring force is too large, the check valve will not be open.
4, if the filling speed too fast, please adjust the filling speed, to reduce the filling speed;
The speed throttle and tanker interval throttle is closed, cannot be closed.
5, water
filling machine can't discharge, whether there is foreign body in the rapid loading the 3-way valve, if you have, please classify, fast loading the 3-way valve hose and whether there is air in the filling head.
6, if there are air, please try to reduce or purging air;
7, check whether all the sealing ring is damaged, if damaged, please replace the new;
If the refill valve valve core is blocked or delayed opening condition, if there is a card, should install the valve core from the very beginning.
8, whether all clip and hose can be sealed, if any, please correct, electromagnetic switch is not loose, please after each adjustment quantity to lock it.
9, water filling machine cylinder piston since does not return, and push to the electromagnetic switch position.
After pressing the emergency stop switch, can adjust the movable magnetic switch from the very beginning.
Guangdong
Jinzong Machinery Co., Ltd. is the largest manufacturer of chemical reactor, which is one of the best product manufactured from us.
Looking for a company to handle your chemical reactor
cosmetic machinery manufacturers? Visit Jinzong Machinery today for more information.
If you need any help in chemical reactor cosmetic machinery manufacturers, Guangdong Jinzong Machinery Co., Ltd. can help you. We provide the best in class. Our design and services will enable you to create the ideal room that you have always wanted!